Preliminary Design and Project Management

Gantt Scheduling Chart (Milestones Professional 2010)
Schedule Changes
The additional time supplied from April 14th through April 24th was used to further improve our Revit model and more fully develop the required activities.  We were also required to design a presentation for April 24th as a result of the additional time allowed.

Bubble Diagram / Building Space Relationship

Design Development Sketch / Initial Sketch

Notes
We stuck closely to our bubble diagram for our more accurate development sketch.  We modified the announcing booth to sit at an angle in the corner of the building (still elevated, with access from the stairs in the storage area) and added a locker room style layout to the rest area (not shown on these sketches).